The Arbor Lofts

We benchmark every TekModo Panel build against traditional delivery methods. Browse the database of schedule compression and cost savings.

Configuration

TP-600 (R-38)

Install Time

-4 Weeks

Waste Factor

Near Zero

Certification

ASTM E72

01

The Challenge

The developer needed to deliver a 12-unit student housing complex before the Fall semester began. However, the original design called for CMU block, and local masons were booked out for 4 months. Delaying meant missing the academic rental window.

Traditional Approach

Tekmodo Approach

02

The "One Lift" Solution

We utilized 30-foot vertical TekmoPANELs. Because the skins are Class A Fire Rated, they met the strict multifamily fire codes without needing additional layers of exterior gypsum. This allowed the crew to Frame, Insulate, and Sheath in a single crane lift.

03

The Outcome

The building envelope was completed in 3 weeks, beating the schedule by 32%. The superior airtightness of the monolithic core is projected to save the owner 15% annually on heating costs compared to the original block design.

Project Audit

Schedule Savings

32% Reduction

Labor Efficiency

3-Man Crew

Change Orders

Zero

Technical Spec

Panel Config

TP-600 (6")

Insulation

R-38 Continuous

Fire Rating

Class A (ASTM E84)

Wind Load

163 PSF

Download the full drawing set and cost analysis.