TekModo Build • TekmoDOPANEL composite SIP system
Direct access to the documents, checklists, and guides that keep your project moving.
Installation & Tolerances
Complete sequencing guide. Foundation prep checklists (+/- 1/4" levelness). Shimming and fastening schedules.
Training Pathway
TekModo Academy registration. Virtual onboarding modules and "Day 1" on-site field rep support request form.
Logistics & Support
Delivery coordination (LIFO Stacking). Crane requirements. "Starter Box" consumables list (splines/glue).
The Jobbox Checklist
No specialized heavy machinery. Standard carpentry tools + specific saw blades and foam guns required.
MEP Rough-In Strategy
How to run wire and pipe. Surface furring vs. hot knife chasing details. Box mounting guides.
Weather Defense
Hydrophobic handling. No-tarp requirements. Drying-in during wet seasons without edge swelling.
Wood frame construction is becoming uninsurable in many markets due to fire risk. TekmoPANEL’s Class A Fire Rating and non-organic composition allow for favorable Builder’s Risk and Property Insurance premiums.
A
Surface Furring (Standard)
Create a 1.5" service cavity. Easiest for subs.
B
Hot Knife Chasing
Dust-free channels cut directly into core.
C
Baseboard Raceways
Ideal for data and low-voltage distribution.
Interactive Rough-In Diagram
We plan the delivery so you don't have to double-handle materials.
LIFO Stacking
"Last In, First Out." Trucks are loaded in reverse installation order. Pick directly from the trailer to the wall.
Just-in-Time
Coordinate delivery drops to match your daily install rate. Keep your laydown area clear on tight sites.
The Starter Box
Every shipment includes splines, sealants, and adhesives. No running to the hardware store for specialized gear.
Email • shanna@tekmodo.net
Phone • 574-970-5800
Location • Three Rivers, MI